A01
|
(1): Job JNW0003 Route 36 CALDWELL, DEKALB County. Scrub Seal 0.8 mile east of Route 31 to 0.6 mile east of Route 33 and eastbound lanes from 2 miles west of Route C to the Caldwell County line near Cameron, the total length of improvement being 15.764 miles.
|
View
|
View
|
|
View
|
|
|
|
Select All
Download Selected Files for Call A01
|
A02
|
(1): Job JNW0029 Route CC, H, J, O BUCHANAN, CLAY, CLINTON County. Resurfacing on Route CC (Buchanan County), Route. J (Clay County), Route H, J and O (Clinton County), the total length of improvement being 27.617 miles.
|
View
|
View
|
|
View
|
|
|
|
Select All
Download Selected Files for Call A02
|
A03
|
(1): Job JNW0084 Route 24, 11 CARROLL, CHARITON, LINN County. Scrub Seal on Route 24 from Carrolton to Keytesville and Route 11 from Brunswick to Route 36, the total length of improvement being 55.573 miles.
|
View
|
View
|
|
View
|
|
|
|
Select All
Download Selected Files for Call A03
|
B01
|
(1): Job JNE0147 Route 156,J,149,C MACON County. ADA improvements at various locations in La Plata, Elmer, Ethel, South Gifford and College Mound, the total length of improvement being 1.41 miles.
|
View
|
View
|
|
View
|
|
|
|
Select All
Download Selected Files for Call B01
|
C01
|
(1): Job JKR0102 Route 50 JOHNSON County. Bridge redeck over Clear Fork Creek, 1.3 miles west of Route 23 near Knob Noster, the total length of improvement being 0.08 miles.
|
View
|
View
|
View
|
View
|
View
|

|
|
Select All
Download Selected Files for Call C01
|
C03
|
(1): Job JKU0017 Route I-29 CLAY, PLATTE County. Coldmill and resurface from Mexico City Ave to Route 69 near KCI, the total length of improvement being 25.173 miles.
|
View
|
View
|
|
View
|
|
|
|
Select All
Download Selected Files for Call C03
|
C04
|
(1): Job JKU0024 Route Holmes JACKSON County. Bridge replacement over I-670 in the Downtown Loop, the total length of improvement being 0.087 miles.
|
View
|
View
|
View
|
View
|
View
|

|
|
Select All
Download Selected Files for Call C04
|
C05
|
(1): Job JKU0108 Route Various CLAY, PLATTE County. ITS improvement at various locations in the Kansas City District, the total length of improvement being 0 miles.
|
View
|
View
|
|
View
|
|
|
|
Select All
Download Selected Files for Call C05
|
C06
|
(1): Job JKU0390 Route Various VARIOUS County. Seal Coat at various locations in the Kansas City District, the total length of improvement being 51.022 miles.
|
View
|
View
|
|
|
|
|
|
Select All
Download Selected Files for Call C06
|
C07
|
(1): Job JKU0422 Route Various VARIOUS County. Job Order Contract for sign replacement at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
|
View
|
View
|
|
View
|
|
|
|
Select All
Download Selected Files for Call C07
|
D01
|
(1): Job J5P3573 Route 54 CAMDEN County. Add lanes, drainage and ADA improvements from South Business Route 5 to city limits of Camdenton, the total length of improvement being 1.16 miles.
|
View
|
View
|
|
View
|
View
|

|
|
Select All
Download Selected Files for Call D01
|
F01
|
(1): Job J6S3289 Route 61/67 JEFFERSON County. Pavement, grading, slide repair, and bridges over Joachim Creek near Pevely, the total length of improvement being 0.759 miles. (2): Job J6S3391 Route 61/67 JEFFERSON County. Lane widening, coldmill, and resurface from Brandon Wallace Way to 6th Street, the total length of improvement being 0.82 miles.
|
View
|
View
|
View
|
View
|
View
|

|
|
Select All
Download Selected Files for Call F01
|
F02
|
(1): Job JSL0222B Route 94 ST CHARLES County. Pedestrian signals at two Katy Trail crossings near Howell Road and Klondike Hill near Matson, the total length of improvement being 0.945 miles.
|
View
|
View
|
|
View
|
|

|
|
Select All
Download Selected Files for Call F02
|
H01
|
(1): Job J9S3692 Route 17 HOWELL County. Resurface from Route 63 to Arkansas State line, the total length of improvement being 17.838 miles.
|
View
|
View
|
|
View
|
|

|
|
Select All
Download Selected Files for Call H01
|