Plans Room Logo
Plans Room Logo
Bid Opening Information for October 2025
Bid Information Updated
Notice of Bid Openings 9/11/2025
Supplemental Notice of Bid Opening -A07, C04, G04 9/18/2025
Blanket Addendum 1 Letter Attention flag 10/7/2025
Withdraw Letter - F01 10/8/2025
Bid Express
Asphalt Price Index
Fuel Price Index
DBE Goal Setting Information
Plan Holder List (MoDOT Plans Room)
Preliminary Quantities 9/18/2025
DBE.bin 9/11/2025
Federal Provisions and Wage Rates 10/7/2025
State Wage Rates 9/11/2025
General Provisions and Supplemental Specs 10/15/2025
Supplemental Plans 10/15/2025
Post Bid Information Updated
Bid Results 10/20/2025
Bid Award Summary 11/6/2025
Bid Tabulations 11/7/2025
Call for 251017 Description Bid Book Bid Book Road JSPs Road J S P Bridge JSPs Bridge J S P Plans Plans Cross Sections Cross Sections Electronic Deliverables Roadway Electronic Deliverables Roadway Electronic Deliverables Bridge Electronic Deliverables Bridge Download Files
A01 (1): Job JNW0021 Route 136 ATCHISON, NODAWAY County. Resurface and ADA improvements from I-29 to Route 71 east of Burlington Junction, the total length of improvement being 29.441 miles.
(2): Job JNW0044 Route 71 NODAWAY County. Resurface from the Iowa State line to Route CC north of Maryville, the total length of improvement being 20.196 miles.
View
Bid Book

View
Road J S P

View
Bridge J S P

View
Plans

Electronic Deliverables Bridge
Select All

Download Selected Files for Call A01
A02 (1): Job JNW0037 Route 6, 69, 36 DAVIESS, GRUNDY, LINN County. Scrub seal on Route 69 and Route 6 in Daviess County, on Route 6 in Grundy County, and East and Westbound lanes of Route 36 in Linn County, the total length of improvement being 50.043 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call A02
A03 (1): Job JNW0042 Route 69 CLINTON County. Resurface from Route 116 to the Clay County line near Lawson, the total length of improvement being 6.783 miles.
(2): Job JNW0089 Route 13, BU 36 CALDWELL, DAVIESS County. Resurface and ADA improvement on Route 13 from Route 6 in Gallatin to Hamilton south city limits and on Bus. 36 from Route 36 to Route 13, the total length of improvement being 16.8 miles.
View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call A03
A04 (1): Job JNW0122 Route 36 DEKALB County. Pavement widening at Bob F. Griffin Road, the total length of improvement being 0.247 miles. View
Bid Book

View
Road J S P

View
Plans

View
Cross Sections

Select All

Download Selected Files for Call A04
A04
ADDENDUM A04-001
Viewpdf document
Electronic Deliverables
Select All

Download Selected Files for Call A04
A05 (1): Job JNWM0110 Route I-29, I-229, US36 ANDREW, BUCHANAN County. Sign replacement at various routes in the Northwest District, the total length of improvement being 0 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call A05
A07 (1): Job JST0154 Route M, UU, WW CARROLL, CHARITON County. Resurface on Route M from Route 65 to Route 11, on Route WW from Route 65 to Route YY, and on Route UU from Route 5 to Dooley Ford Road, the total length of improvement being 26.65 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call A07
B02 (1): Job JNE0054 Route 168, JJ MARION County. Diamond grinding on Route 168 from Palmyra to Route JJ and on Route JJ from Route 168 to the end of state maintenance, the total length of improvement being 5.381 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call B02
B1A (1): Job J2S3377 Route W LINCOLN County. Resurface from Route KK to Route 47 near Troy, the total length of improvement being 4.047 miles.
(2): Job JNE0075 Route D PIKE County. Resurface from Route 79 to Route 61 in Eolia, the total length of improvement being 15.03 miles.
(3): Job JNE0087 Route U LINCOLN County. Seal coat from Route 47 to 0.7 mile west of Route 61 near Moscow Mills, the total length of improvement being 13.106 miles.
(4): Job JNE0092 Route W LINCOLN County. Seal coat from Route B near New Hope to Route KK, the total length of improvement being 7.811 miles.
(5): Job JNE0093 Route EE LINCOLN County. Resurface from Route Y to Route 47 near Winfield, the total length of improvement being 5.247 miles.
(6): Job JNE0094 Route B LINCOLN County. Seal coat from Route 61 to Route 79 at Elsberry, the total length of improvement being 10.517 miles.
View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call B1A
B1B (1): Job JNE0096 Route 61 OR LINCOLN County. Resurface from Route V to Route C near Moscow Mills on various segments of Route 61 outer roads, the total length of improvement being 5.168 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call B1B
C01 (1): Job JKR0079 Route 20 LAFAYETTE, SALINE County. Pavement repair from Route W in Lafayette County to Route EE in Saline, the total length of improvement being 12.07 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call C01
C04 (1): Job JKU0042 Route 78 JACKSON County. Coldmill, resurface from I-435 to 291, the total length of improvement being 6.0004 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call C04
C04
ADDENDUM C04-001
Viewpdf document
View
Bid Book

View
Plans

Select All

Download Selected Files for Call C04
C04
ADDENDUM C04-002
Viewpdf document
View
Bid Book

View
Plans

Select All

Download Selected Files for Call C04
C05 (1): Job JKU0062 Route I-435 JACKSON County. Coldmill and resurface from Route 24 to Route 78 near Independence, the total length of improvement being 3.318 miles. View
Bid Book

View
Road J S P

View
Plans

Electronic Deliverables
Select All

Download Selected Files for Call C05
C06 (1): Job JKU0064 Route 169 CLAY County. Coldmill and resurface from I-29 to the Buck O'Neil Bridge, the total length of improvement being 3.453 miles. View
Bid Book

View
Road J S P

View
Plans

Electronic Deliverables
Select All

Download Selected Files for Call C06
C06
ADDENDUM C06-001
Viewpdf document
View
Plans

Select All

Download Selected Files for Call C06
C06
ADDENDUM C06-002
Viewpdf document
View
Bid Book

Select All

Download Selected Files for Call C06
C08 (1): Job JKU0400 Route 58 CASS County. Resurface from Route 291 to Johnson County line on Route 58 near Pleasant Hill, the total length of improvement being 14.079 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call C08
C08
ADDENDUM C08-001
Viewpdf document
View
Bid Book

View
Plans

Select All

Download Selected Files for Call C08
C09 (1): Job JKU0451 Route I-435 JACKSON County. Sound wall repair 0.3 mile west of Grandview Road, the total length of improvement being 0.018 miles.
(2): Job JKU0453 Route I-435 JACKSON County. Concrete barrier repair at Wornall Road in Kansas City, the total length of improvement being 0.05 miles.
View
Bid Book

View
Road J S P

View
Plans

Electronic Deliverables
Select All

Download Selected Files for Call C09
D01 (1): Job J5P3532 Route 5 HOWARD County. Bridge rehabilitation over Sulphur Creek, the total length of improvement being 0.027 miles.
(2): Job JCD0110 Route 5, 40 HOWARD County. Intersection improvement at Route 5 and Route 40 intersection north of Boonville, the total length of improvement being 0.828 miles.
(3): Job JCD0195 Route 124, BB, CC BOONE, HOWARD County. Resurface and add shoulders on Route 124 from Fayette to Hallsville, on Route BB from Rocheport to I-70, and on Route CC from Route 63 to Route V in Sturgeon, the total length of improvement being 30.591 miles.
View
Bid Book

View
Road J S P

View
Bridge J S P

View
Plans

View
Cross Sections

Electronic Deliverables
Electronic Deliverables Bridge
Select All

Download Selected Files for Call D01
D01
ADDENDUM D01-001
Viewpdf document
View
Bid Book

View
Plans

Electronic Deliverables
Select All

Download Selected Files for Call D01
D02 (1): Job J5P3554 Route 54, KK CAMDEN, MILLER County. Coldmill and resurface on Route 54 from the Osage River to Niangua River and on Route KK from Route 54 to end of state maintenance, the total length of improvement being 29.724 miles.
(2): Job JCD0200 Route 242, MM CAMDEN, MILLER County. Coldmill and resurface on Route 242 from Route MM in Camden County to Route 54 near Lake Ozark and on Route MM in Camden County from Route 242 to the Community Bridge, the total length of improvement being 2.173 miles.
View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call D02
D04 (1): Job JCD0155 Route OR 63 CALLAWAY County. Resurface from end of state maintenance to Cedar City Drive, the total length of improvement being 1.297 miles.
(2): Job JCD0156 Route OR 54 CALLAWAY County. Resurface from South Summit Drive to end of state maintenance, the total length of improvement being 0.72 miles.
View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call D04
D05 (1): Job JCD0208 Route Various VARIOUS County. Seal coat on Route U and Route E in Washington County, on Route ZZ and Route DD in Crawford County, and Route F in Dent County, the total length of improvement being 42.991 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call D05
D07 (1): Job JCD0247 Route 133, 28, AA, P, OR LACLEDE, MARIES, PULASKI County. Resurface on Route 28 from Route Z to Route 63, on Route 133 from Route 17 to I-44, on I-44 SOR from Route 17 to Route H, on I-44 SOR from Route H to SME, on Route P the full length, and on Route AA from Route AB to Route NN, the total length of improvement being 55.857 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call D07
D07
ADDENDUM D07-001
Viewpdf document
View
Bid Book

Select All

Download Selected Files for Call D07
D07
ADDENDUM D07-002
Viewpdf document
View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call D07
D08 (1): Job JCD0248 Route Various VARIOUS County. Resurface on North OR 44 from Cuba to Route WW, on South OR 44 from Cuba to Route D, and on Route CC from Route 21 to near Blackwell, the total length of improvement being 26.297 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call D08
D09 (1): Job JCDP0006 Route Various CAMDEN, MILLER County. Resurface Various routes near Osage Beach Parkway, Whispering Oaks/Black Road, McCubbins Drive, Route 134, Ozark Caverns Road near Passover and Osage Beach, the total length of improvement being 12.374 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call D09
D09
ADDENDUM D09-001
Viewpdf document
View
Bid Book

View
Plans

Select All

Download Selected Files for Call D09
D10 (1): Job JST0152 Route V, E CHARITON, HOWARD County. Resurface from east of Park Road to end of state maintenance, Route V from Route 3 to Route 5, the total length of improvement being 21.176 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call D10
F02 (1): Job J6P3510C Route Various VARIOUS County. ADA improvements various locations in the St. Louis District, the total length of improvement being 0 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call F02
F02
ADDENDUM F02-001
Viewpdf document
View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call F02
F03 (1): Job J6Q2026E Route Various FRANKLIN, JEFFERSON, ST CHARLES, ST LOUIS, ST LOUIS CITY County. ITS maintenance at various locations in the St. Louis District, the total length of improvement being 0 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call F03
F03
ADDENDUM F03-001
Viewpdf document
View
Road J S P

Select All

Download Selected Files for Call F03
F04 (1): Job J6S3289 Route 61/67 JEFFERSON County. Bridge replacement and slide repairs over Joachim Creek near Pevely, the total length of improvement being 0.759 miles.
(2): Job J6S3391 Route 61/67 JEFFERSON County. Resurface and widening from Brandon Wallace Way to 6th Street in Pevely, the total length of improvement being 0.759 miles.
View
Bid Book

View
Road J S P

View
Bridge J S P

View
Plans

View
Cross Sections

Electronic Deliverables
Electronic Deliverables Bridge
Select All

Download Selected Files for Call F04
F04
ADDENDUM F04-001
Viewpdf document
View
Bid Book

View
Plans

Select All

Download Selected Files for Call F04
F04
ADDENDUM F04-002
Viewpdf document
View
Road J S P

Select All

Download Selected Files for Call F04
F04
ADDENDUM F04-003
Viewpdf document
View
Plans

Select All

Download Selected Files for Call F04
F04
ADDENDUM F04-004
Viewpdf document
View
Road J S P

Select All

Download Selected Files for Call F04
F05 (1): Job J6S3578 Route 61/67 ST LOUIS County. Coldmill, resurface, bridge rehabilitation, and ADA improvements from north of I-270 on Route 61 to route 186 near Oakville, the total length of improvement being 4.25 miles. View
Bid Book

View
Road J S P

View
Bridge J S P

View
Plans

View
Cross Sections

Electronic Deliverables
Select All

Download Selected Files for Call F05
F05
ADDENDUM F05-001
Viewpdf document
View
Road J S P

View
Plans

Select All

Download Selected Files for Call F05
F06 (1): Job JSL0041 Route CC JEFFERSON County. Resurface, shouldering, and pavement repair from Route 67 to Route 110, the total length of improvement being 5.532 miles. View
Bid Book

View
Road J S P

View
Plans

Electronic Deliverables
Select All

Download Selected Files for Call F06
G01 (1): Job J7P3511 Route Various BATES County. ADA improvements in Adrian and Butler, the total length of improvement being 0.179 miles.
(2): Job J7S3398 Route J, V HENRY County. ADA improvements from Route 52 to 0.3 miles north of Calhoun, the total length of improvement being 0.3 miles.
View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call G01
G01
ADDENDUM G01-001
Viewpdf document
View
Bid Book

View
Plans

Select All

Download Selected Files for Call G01
G02 (1): Job J8S0836D Route MM GREENE County. Grading, drainage, bridge, ADA & paving from County Road 160 to Route 60 and add lanes from Haile Street to County Road 160 in Republic, the total length of improvement being 1.932 miles. View
Bid Book

View
Road J S P

View
Bridge J S P

View
Plans

View
Cross Sections

Electronic Deliverables
Electronic Deliverables Bridge
Select All

Download Selected Files for Call G02
G02
ADDENDUM G02-001
Viewpdf document
View
Bid Book

View
Plans

Electronic Deliverables Bridge
Select All

Download Selected Files for Call G02
G03 (1): Job JSR0269 Route I-44 JASPER County. Pavement resurfacing, repair bridge approaches from 1.3 miles east of Route 37 to Route Z and O near Halltown, the total length of improvement being 53.805 miles.
(2): Job JSR0344 Route I-44 JASPER, LAWRENCE County. Repair bridge approaches at various locations from 1.25 miles east of Route 37 to Route Z and O near Halltown, the total length of improvement being 53.805 miles.
View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call G03
G04 (1): Job J8S3158 Route OR 65 GREENE County. Bridge replacement and ADA improvements on Eastgate Avenue over Thayer North Sub Railroad in Springfield, the total length of improvement being 0.226 miles. View
Bid Book

View
Road J S P

View
Bridge J S P

View
Plans

View
Cross Sections

Electronic Deliverables
Electronic Deliverables Bridge
Select All

Download Selected Files for Call G04
G04
ADDENDUM G04-001
Viewpdf document
View
Plans

Select All

Download Selected Files for Call G04
G05 (1): Job JST0165 Route CC, JJ, Y GREENE, POLK County. Resurface Route CC from MO13 to US65, Route JJ from Route BB to MO215, and Route Y from MO13 to 3.519 miles east of MO13, the total length of improvement being 19.599 miles. View
Bid Book

View
Road J S P

Select All

Download Selected Files for Call G05
G05
ADDENDUM G05-001
Viewpdf document
View
Bid Book

View
Road J S P

Select All

Download Selected Files for Call G05
H01 (1): Job J9S3774 Route Z DUNKLIN County. Bridge replacement over Main Drainage Ditch at Route Z near Kennett, the total length of improvement being 0.073 miles. View
Bid Book

View
Road J S P

View
Bridge J S P

View
Plans

View
Cross Sections

Electronic Deliverables
Electronic Deliverables Bridge
Select All

Download Selected Files for Call H01
H02 (1): Job J9S3798 Route Various VARIOUS County. ADA improvements at various locations in Bernie, Campbell and Portageville, the total length of improvement being 0.64 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call H02
H03 (1): Job JSE0117 Route 25 CAPE GIRARDEAU, STODDARD County. Resurface from Route 77 to Route 91 near Advance, the total length of improvement being 15.43 miles. View
Bid Book

View
Road J S P

View
Plans

Electronic Deliverables Bridge
Select All

Download Selected Files for Call H03
H03
ADDENDUM H03-001
Viewpdf document
View
Bridge J S P

Select All

Download Selected Files for Call H03
H04 (1): Job JSE0141 Route Various VARIOUS County. ADA Improvements on Route AA in Bloomfield and on Route 72 in Arcadia and on Route 61 in Jackson and Route O in Park Hills, the total length of improvement being 3.607 miles. View
Bid Book

View
Road J S P

View
Plans

Select All

Download Selected Files for Call H04
H04
ADDENDUM H04-001
Viewpdf document
View
Plans

Select All

Download Selected Files for Call H04
H05 (1): Job JST0161 Route AD,ZZ,CC,K,BB,M,Y,Z DUNKLIN, NEW MADRID, PEMISCOT County. Resurface from Route K, BB, CC, M and Y in Pemiscot County, Routes AD and ZZ in New Madrid County and Route Z in Dunklin County, the total length of improvement being 70.92 miles. View
Bid Book

View
Road J S P

Select All

Download Selected Files for Call H05